Products & Projects · Energy & Scope 2
China GEC Eligibility, Procurement & Cancellation
For sites using electricity in China and a specified use, we check GEC sources, transactions and cancellation records, and confirm the proof required.
Where It Applies
GEC procurement and proof of consumption for sites using electricity in China.
China Green Electricity Certificates are governed by a scheme under the National Energy Administration. The authorities have set up mechanisms for issuance, trading, use and cancellation, and operate a national GEC issuance and trading system.
Proof of renewable electricity consumption within China and acceptance under international disclosure frameworks need to be checked separately. Buying GECs does not mean the same claim can be made for any overseas site or under any framework.
Pre-Procurement Information
Consumption location, period, entity, volume, and the framework or customer requirements to be met.
Market & Usage Conditions
Supply, trading and intended use of China GECs each need to be confirmed.
GECs track the environmental attributes of renewable electricity in China and serve as proof of consumption. Using them across frameworks still requires checking each framework's conditions.
Certificates & Supply
Check the generating project, energy type, generation period, tradable status and validity period, and confirm the source specifications the buyer needs.
Trading & Cancellation
Confirm account, procurement or green electricity trading arrangements under the current scheme and trading platforms, and track GECs and green electricity consumption certificates or cancellation records.
Markets & Acceptance
Check domestic uses, group targets and international framework requirements separately. Prices are compared using valid quotes for the same specifications, and holding GECs is not treated as automatically meeting every accounting rule for exports.
Project Scope
We source quotes and complete delivery to the confirmed specifications.
The buyer confirms the intended use and specifications, and the transaction then follows the scheme's procedures.
Use & Requirements
Check the consuming entity, location, period and volume, and list mandatory source criteria separately from additional preferences.
Batch & Quote Review
Obtain source, vintage, volume, price, fees and delivery window, and check ownership and supplier documents.
Delivery & Usage Documents
Check transaction, transfer and usage evidence against the scheme's requirements, and match it to the beneficiary, site and reporting year.
Deliverables & Completion Criteria
We deliver an eligibility conclusion and batch documentation.
Proof of use is named and handled according to each scheme's procedures, and open items are tracked separately.
Eligibility & Specification Sheet
Site, intended use, rule version, source criteria and volume.
Procurement & Delivery Record
Dated quotes, contracts, batch or scheme identifiers, and delivered volume.
Usage Evidence & Limits
Usage claim or cancellation records generated by the scheme, and the limits to observe when using them externally.
Each scheme's procedures and each target framework's acceptance criteria are confirmed separately. Actual procurement relies on current rules and valid quotes.
China GEC Eligibility, Procurement & Cancellation
Confirm intended use, source and delivery terms.
Share your consumption sites, reporting year, volume and customer or framework requirements, and we can define the scope of assessment and procurement.
