Products & Projects · Energy & Scope 2

Energy Portfolio Comparison & Investment Appraisal

Based on specified sites, loads and quotes, we build cost and scenario comparisons of energy efficiency, solar-plus-storage, PPAs and EACs.

Common AssumptionsOption ModelsDecision Report

Where It Applies

Comparing energy options for specified sites on one set of assumptions.

When a company has received proposals for equipment, power purchases or certificates and is preparing to decide the order of investment, each quote often uses different terms, consumption and cost assumptions. The assessment first aligns the basis of comparison, then checks operational and target constraints.

  • Baseline & Load

    Time-of-use consumption, electricity costs, contracted capacity and operational changes at the specified sites.

  • Candidate Options

    Quotes, specifications, estimated benefits, contract terms and other conditions proposed by suppliers.

  • Decision Constraints

    Budget, payback requirements, energy supply reliability, targets and the expected decision date.

Prerequisites & Data

Model inputs are confirmed with operations and finance first.

Results depend on the quality of load data and quotes; where data is insufficient, we start with scenario ranges.

  • Consumption & Tariffs

    Provide load data (hourly, or at the best available interval), bills, contracts and expected changes in production capacity.

  • Candidate Options

    Compile quotes and technical terms for efficiency, solar PV, storage, PPAs or EACs, and state what can be compared.

  • Finance & Targets

    Agree on the evaluation period, cost of capital, budget, operational constraints and energy or emissions targets.

Project Scope

Building cost, cash flow and risk comparisons.

The model retains assumptions, data sources and adjustable parameters.

  1. Baseline Scenario

    Use current tariffs, loads and contracts as a common starting point, checked against historical spending.

  2. Options & Sensitivity

    Compare investment, O&M, supply, price and demand changes, and check relevant parameters such as storage efficiency and equipment degradation.

  3. Decision & Next Inputs

    Set out the preferred option, the conditions it depends on, and items that still need site surveys, quotes or specialist confirmation.

Deliverables & Completion Criteria

We deliver a decision-ready model and comparison table.

Estimates, quotes and confirmed conditions are labeled separately.

  • Scenario Model

    Baseline and candidate options, input assumptions, calculations and results.

  • Option Comparison Table

    Lifetime cost, cash flow, contribution to targets and key risks.

  • Decision Checklist

    Recommended sequence, applicable conditions and the work required in the next phase.

Engineering design and procurement are scoped separately for the selected option; the assessment does not promise a fixed percentage of savings.

Energy Portfolio Comparison & Investment Appraisal

Confirm the scope and timeline for this work.

Share electricity bills, load data, site details, targets and supplier quotes to agree on the comparison scope and analysis period.